The question behind the question
"Fixed price or time and materials?" is often a buyer's first question, and the last one that should be answered. Behind it sits another: who carries the risk when the project does not go as planned? Bespoke software never goes exactly as planned. The need becomes clearer along the way, a technical constraint appears, a business priority changes.
The contract model does not remove that uncertainty. It decides who pays for it, and in what form: a budget overrun, a reduced scope, a delay or lower quality.
If you are buying software from a French supplier, you will meet three terms in proposals: forfait (fixed price), régie (time and materials) and forfait agile (agile fixed price). This article compares them, then lists what to write into the contract whichever model you choose. It is general information for a buyer, not legal advice: have your contract reviewed by a lawyer qualified in French law or by your legal department.
Obligation of result versus obligation of means
French proposals constantly refer to two notions, engagement de résultat and engagement de moyens. In plain terms:
- Obligation of result (engagement de résultat). The supplier commits to delivering something defined: software that conforms to a specification, by a date, for a price. If it does not deliver, it is in default, unless it can show a cause it is not responsible for.
- Obligation of means (engagement de moyens). The supplier commits to applying the skills and diligence expected of a professional. It does not guarantee a specific outcome. To hold it liable, the client has to show that it did not do what it should have done.
Two practical remarks. First, the title of the contract is not enough: read what the supplier actually commits to, clause by clause. A "fixed price" riddled with assumptions and exclusions commits to very little. Second, an obligation of result presupposes that the result is described. Without a precise specification (the cahier des charges) and acceptance criteria, it is not worth much.
Forfait: one price, one scope, one date
The supplier prices a defined scope and commits to a price and a deadline. This is the classic model of the V-model project, with a business-side project owner that specifies (the MOA) and a delivery side that builds (the MOE).
How the budget behaves. It is set at signature. That is the main attraction: you know what you will spend, for a constant scope.
How the scope behaves. It is frozen. Any change goes through an amendment or a change request, priced separately. This is where the "fixed" budget stops being fixed.
What you should know.
- The supplier builds a risk provision into its price. You pay for that safety margin whether or not the risk materialises.
- The specification has to be written before you go to market, which takes time and assumes you know what you want.
- When things get tense, the supplier's interest is to deliver the strict contractual scope at the lowest cost. The debate moves to how the specification should be interpreted.
- What you discover during the project, and you will discover things, is expensive to incorporate.
Fixed price works well when the need is stable, known and describable: a like-for-like technical migration, an interface between two systems with defined formats, a website redesign whose content is settled.
Régie: time and skills
Under régie, also called assistance technique, you buy the time of qualified people, invoiced on time spent. The supplier commits to the skills and continuity of the team, not to a deliverable.
How the budget behaves. It is proportional to the time consumed. You steer it through duration and team size, and you can stop or reduce it subject to the agreed notice period.
How the scope behaves. It is open. You change priorities whenever you want, with no amendment.
What you should know.
- Steering is your job. Without an available product owner and a maintained backlog, a time-and-materials team burns budget with no clear direction.
- Nothing in the contract ties spending to an outcome. Your only protection is your ability to see regularly what is being produced.
- The supplier's economic interest is not to finish quickly.
- In France this model is framed by labour law. The French Labour Code prohibits for-profit operations whose exclusive purpose is the lending of staff (article L. 8241-1). In practice the supplier must remain the employer and manager of its people, and the service must rest on identified expertise. This often surprises international clients used to directing contractors as if they were staff: your legal adviser will tell you how to organise the relationship.
Time and materials suits reinforcing an in-house team, an exploration phase, or placing a team inside a set-up you already run, for example a SAFe train.
Forfait agile: between the two
The agile fixed price tries to keep the best of both models: a readable budget framework for the buyer, and the ability to adjust scope sprint after sprint. The expression covers several arrangements, and it is worth telling them apart before comparing proposals.
Budget ceiling, adjustable scope
Budget and deadline are fixed. Scope is described by a prioritised backlog rather than a frozen specification. The supplier commits to a production capacity and to objectives, not to the exhaustive list of features. If a new request comes in, another of comparable size goes out: a like-for-like swap within the same budget.
This is the most common variant. It depends on one discipline: accepting that not everything will be built, and that the lowest priorities are the adjustment variable.
Fixed price per sprint
Each sprint carries its own commitment: content agreed at the start of the iteration, a fixed price per sprint, a demo and sign-off at the end. You get a decision point every two or three weeks, with the option to change direction or stop.
Fixed price per work package
The project is split into packages (lots) lasting a few weeks to a few months. A scoping phase, often invoiced separately, produces the initial backlog and the price of the first package. Each package is then a small fixed-price contract, priced once its content is sufficiently known. Procurement departments like this arrangement, because each commitment stays conventional, while nobody has to price up front what nobody knows yet.
Work units
Some contracts fix the price of a production unit (unité d'œuvre: a complexity point, a ticket type, a feature template) and let the volume vary. You will find this in application maintenance contracts (TMA, tierce maintenance applicative) and service centres. It needs a clear price grid and a shared estimation method, otherwise the discussion is about the number of points rather than the software.
The three models compared
| Fixed price (forfait) | Time and materials (régie) | Agile fixed price (forfait agile) | |
|---|---|---|---|
| Dominant commitment | Result | Means | Mixed: capacity, objectives, quality |
| Budget | Set at signature | Variable, on time spent | Capped, or fixed per sprint or package |
| Scope | Frozen, changes by amendment | Open | Adjustable through prioritisation |
| Overrun risk | Borne by the supplier, then by you through amendments | Borne by you | Shared |
| What the client must bring | A complete specification | Day-to-day steering capacity | An available product owner with authority to decide |
| Visibility during the project | Low until acceptance | High if you follow closely | High, a demo every sprint |
| Main pitfall | Disputes over what the specification means | Drift with no tangible result | Vagueness about what is actually guaranteed |
What to put in the contract
Whatever the model, four subjects make the difference on the day something goes wrong.
Acceptance criteria
Describe how a delivery is accepted (the recette): who validates, on which environment, within what time, and what happens if nobody responds. Classify defects by level (blocking, major, minor) and state which ones prevent acceptance. In agile, acceptance happens every sprint or every package, based on acceptance criteria written with the user stories and a shared definition of done. A signed acceptance record (procès-verbal de recette), even a light one, avoids late arguments.
Change handling
For a fixed price, set out the change request procedure: who raises it, how quickly it is priced, who approves it. For an agile fixed price, write down the like-for-like swap rule and name the person who arbitrates priorities. In both cases give the steering committee (comité de pilotage) a precise role: it decides what the project team cannot.
Intellectual property
Do not assume that paying the invoice makes you the owner of the code. The French Intellectual Property Code vests in the employer the economic rights in software created by its employees in the course of their duties (article L. 113-9). Since the developers are the supplier's employees, it is an assignment clause that must organise the transfer to you. The same code makes the transfer of author's rights conditional on each assigned right being mentioned separately and on its exploitation being delimited as to scope, purpose, place and duration (article L. 131-3). A phrase such as "all rights assigned" should therefore be replaced by a detailed clause drafted by a lawyer.
Three related points deserve attention: when the transfer takes place (on delivery or on payment), what happens to the supplier's pre-existing components, and the list of open source dependencies with their licences.
Reversibility
You must be able to change supplier or bring the software in-house. Provide for permanent access to the code repository, ideally hosted on your own account, installation and operations documentation, handover of access rights and secrets, and a knowledge-transfer period whose length and price are set in advance. Reversibility should be tested: a third-party team must be able to rebuild and deploy the application from what has been delivered.
And also
A warranty period after acceptance and what it covers, early termination terms and notice, team stability commitments, and the security and data protection requirements that apply to the project.
Decision guide by project type
Choose fixed price if the need is stable and describable, you have a complete specification or the time to write one, and your first constraint is a firm budget. Examples: a like-for-like technical migration, a connector between two systems, a regulatory package with published rules.
Choose time and materials if you have a team and an organisation in place and lack skills or capacity, or if you are exploring a subject without yet knowing what you will build. You must be able to steer day to day.
Choose agile fixed price if you are creating a product whose requirements will sharpen with use: a new business application, a SaaS platform, a redesign with functional change. You have a budget to hold, an available product owner, and you accept prioritisation.
Combine models if the project has phases of a different nature. A frequent sequence: scoping at a fixed price, build as an agile fixed price by package, then application maintenance in work units or for a fixed monthly fee once the software is in production.
Be wary of a fixed price signed without a specification, time and materials without a product owner, and an agile fixed price where nobody can say what is guaranteed.
Conclusion
The right contract is the one that matches what you know about your need at the time you sign. If you know precisely what you want, a fixed price protects you. If you do not know yet, it gives you security in appearance only, and a model that organises adjustment will be more honest and often cheaper. In every case, acceptance, code ownership and reversibility are negotiated before the project starts, not on the day the relationship becomes strained.