Cloud migration and application hosting
YOUR DIGITAL HUB, a custom software development company, handles the cloud migration of your application and then, if you wish, its hosting and day-to-day operations. The infrastructure is in the hands of the team that knows the code: you keep one point of contact for the software and for its production environment.
Who this service is for
- Your application runs on an ageing server, or your hosting contract is about to end.
- You have no operations team and nobody is really watching production.
- Your hosting provider and your development supplier blame each other at every incident.
- Your cloud bill keeps growing and nobody can explain why.
What the service covers
The offer has two parts, which can be ordered together or separately.
Migration. We move an existing application to the cloud, most often a migration to AWS: design of the target cloud architecture, build of the environments, data transfer and cutover.
Hosting and managed operations. Once the application is live, we run it day to day:
- upkeep of the production and staging environments;
- deployment of new versions;
- security updates for the system and its components;
- monitoring, with alerts on availability, errors and saturation;
- backups and periodic checks that they can be restored;
- the disaster recovery plan, written and then put to the test;
- cloud cost tracking and sizing adjustments;
- a regular report on incidents and interventions.
The steps of a migration
- Inventory. We list the components, data flows, data volumes, dependencies and constraints: busy periods, data location, acceptable downtime.
- Target architecture and estimate. We propose a cloud architecture sized for your load, with an estimate of monthly hosting costs. You approve it before anything is built.
- Building the environments. The infrastructure is described with Terraform, in a repository you can read. The application is packaged in containers where that makes sense.
- Deployment pipeline. Every version is built, tested and deployed the same way on all environments.
- Rehearsal. The data migration is run as a dry run on a staging environment. We measure how long it really takes and fix what needs fixing.
- Cutover. It is scheduled with you, in a chosen time slot, with a rollback procedure prepared and tested.
- Handover to operations. Monitoring, backups and procedures are in place before the old hosting is switched off.
What you receive
- The cloud architecture diagram and the record of decisions made.
- The migration plan, with the cutover and rollback procedures.
- The infrastructure code and deployment configuration, under version control.
- The monitoring dashboards and the list of configured alerts.
- The backup policy and the disaster recovery plan, with the results of restore tests.
- Operations documentation that a team other than ours could use.
How the work is contracted
The migration is a fixed-price engagement, quoted after a scoping phase: scope, steps and deliverables are written down before work starts. If the existing system is poorly known, the scoping can be ordered on its own.
Hosting and managed operations run under a recurring contract, which describes the scope we operate, the operations included and how interventions are handled. Service levels are defined in the contract, according to how critical your application is. Changes outside that scope are handled on a time-and-materials basis or through an additional fixed price.
We recommend that the cloud account is opened in your name: you remain the owner of the infrastructure, the data and the code. Reversibility is planned from the start. Our article on fixed price, time and materials and agile contracts compares these contract forms.
Frequently asked questions
Do we have to migrate to AWS?
No. AWS is the platform we use most, but the choice depends on your load, your budget and your data location constraints. A European host or dedicated servers are sometimes a better fit. Scoping is where that decision is made.
Will the application be unavailable during the migration?
That depends on its architecture and on the volume of data. The dry run tells us how long the cutover really takes. If downtime is needed, it is announced in advance and placed in a low-activity time slot.
Can you host an application you did not build?
Yes, after a review of the code and the infrastructure. We need to know what we are operating before we commit to it. A code and security audit can come before the takeover.
How are cloud costs kept under control?
The estimate is provided before the migration. After that, budget alerts flag any drift, resources are tagged by environment and sizing is reviewed periodically.
Further reading
- Cloud and infrastructure expertise — our technical choices: architecture, containers, Terraform, observability.
- Cybersecurity expertise — security of the infrastructure and of the application.
- Cloud and hosting — all our services in this area.
- Legacy application modernization — when the application has to be modernized before or during the migration.
- Architecting PHP on AWS and a CI/CD pipeline for Symfony with GitHub Actions — two detailed articles from our blog.
Are you preparing a migration, or looking for a team to run your application? Describe your project.