Software requirements specification: template and example

12 min read

Cover — Software requirements specification, template and example

The requirements specification in brief

A software requirements specification is the document in which a client describes what it expects from a piece of software or an application: the problem to solve, the users, the features, the constraints and how delivery will be judged acceptable. It is used to consult suppliers, obtain comparable quotes and set the reference for the contract.

In France this document is called the cahier des charges, and you will be asked for it by any French supplier. It describes a need, not a solution. Ten to twenty well-structured pages are enough for most business applications. This guide gives the full template, a filled-in example, an outline to copy and the lightweight version for an agile project.

What it is for, and who writes it

The document does three jobs.

  • Aligning internally. Writing it forces management, business teams and IT to agree on scope and priorities before money is spent.
  • Consulting suppliers. Every supplier answers the same request. Without it, you compare quotes that do not cover the same project.
  • Contracting. Attached to the contract, it becomes the reference for acceptance. In a fixed-price contract (forfait), the supplier's commitment to a result is only as strong as this document is precise.

It is written by the client. French projects call this side the maîtrise d'ouvrage (MOA), the party that owns the business need, as opposed to the maîtrise d'œuvre (MOE), which builds. In practice the author is the person who carries the business need, supported by a few future users and by internal IT for technical constraints. If you lack time or distance, a scoping phase run with a supplier or a business analyst produces the same document.

Functional versus technical specification

French practice distinguishes a cahier des charges fonctionnel and a cahier des charges technique. They are two levels of description, often combined in a single document for a mid-sized project.

Functional specification Technical specification
Question answered What the software must do, for whom, under what conditions In what environment and under which constraints it must be built
Author The business side The client's IT department or technical lead
Typical content Users, journeys, business rules, priorities Existing systems, exchange formats, hosting, security, internal standards
Level of detail The need, without presuming the solution Imposed constraints, not the detailed architecture

The standard NF EN 16271, the French edition of European standard EN 16271, published in 2013 in place of NF X50-151, covers the functional expression of need and the functional performance specification. Its principle applies to any project: express the need as functions and performance criteria, and leave the choice of means to the supplier.

The full template, section by section

1. Context and objectives

Introduce the organisation in a few lines, then the current situation: how the work is done today, with which tools, and what goes wrong. Then state two to four measurable objectives, for example "reduce the processing time of a request from five days to two". A quantified objective lets the supplier propose trade-offs, and lets you judge the outcome.

2. Users and roles

List the user profiles, their approximate number, their context of use (office, field, mobile, unreliable connection) and their permissions. The number of roles is one of the first drivers of an application's complexity.

3. Scope and out of scope

Say what the project covers and, with equal care, what it does not: postponed modules, excluded populations, systems that will not be replaced. The exclusion list prevents most end-of-project disagreements.

4. Functional needs

Write them as user stories: "As a [role], I want [action] so that [benefit]", grouped by domain. Give each a priority, for example with the MoSCoW method (must have, should have, could have, won't have this time). If everything is a must, nothing is prioritised and the supplier cannot offer any variant.

5. Business rules

These are the rules the software must enforce: calculations, thresholds, approval workflows, statuses and allowed transitions, special cases. Number them. They are what costs most when discovered late.

6. Data and volumes

Describe the main objects handled (customers, cases, orders), current volumes and those expected in three years, the data to migrate from existing tools and its quality, and retention periods.

7. Interfaces with existing systems

For each system to connect (ERP, CRM, directory, payment, messaging), give the direction of the exchange, the data concerned, the frequency and what you know of the technical means: documented API, file export, nothing yet. State who, on your side or at the third-party vendor, can answer questions.

8. Non-functional requirements

  • Performance and availability. Number of concurrent users, expected response times on key screens, hours of use, tolerance to interruption.
  • Security. Authentication method, audit trail, sensitivity of the data. You can ask the supplier to position itself against a public reference, such as the OWASP ASVS for the application and, in France, the ANSSI IT hygiene guide for operations.
  • Personal data. The GDPR requires data protection by design and by default (Article 25) and security measures appropriate to the risk (Article 32). If the supplier processes personal data on your behalf, for instance by hosting or maintaining the application, a processor contract compliant with Article 28 is required. State the categories of data, the retention periods and whether a data protection impact assessment (Article 35) is planned. The linked texts are the French version published by the CNIL, the French data protection authority.
  • Accessibility. In France, the obligation in Article 47 of the law of 11 February 2005 applies to public bodies, private bodies entrusted with a public service mission and companies with a turnover of 250 million euros or more, with the RGAA as the reference framework. Since 28 June 2025, Directive (EU) 2019/882, the European Accessibility Act, extends accessibility requirements to consumer-facing services including e-commerce and banking; service companies with fewer than ten employees and a turnover below two million euros are exempt, according to the EU's Your Europe portal. Check whether you are concerned and state the target level.
  • Hosting and operations. Cloud or on-premises, data location, backups, monitoring, expected environments (test, staging, production).
  • Compatibility. Browsers, mobile operating systems, languages.

9. Constraints

Technologies required or excluded by your IT department, brand guidelines, regulatory or commercial deadline, availability of your teams, sector regulation.

10. Expected deliverables

Source code and repository, installation and operations documentation, test sets, training, knowledge transfer. State your expectations on code ownership and reversibility.

11. Acceptance criteria

Who validates, on which environment, against which scenarios, within what time, and how defects are classified (blocking, major, minor). French contracts call this phase the recette.

12. Schedule

Desired start date, imposed milestones, target go-live date and the reason for it. Separate firm deadlines from wishes.

13. Budget framing

Give an envelope or a range. A supplier who knows the budget proposes the best scope for that amount; without it, everyone guesses and the quotes diverge. Our article on custom software development cost explains how that budget is built.

14. Response format and selection criteria

Expected format of the proposal, deadline, contact for questions, how presentations will run, and the selection criteria with their weight: understanding of the need, method, proposed team, price, references.

Filled-in example (fictional application)

The extract below is a fictional example, deliberately short, to show the expected level of detail. The company and the figures are invented.

Project. A work-order management application for a 60-person maintenance company.

Context. Requests arrive by phone and email, are entered in a shared spreadsheet, then assigned by hand. There is no overview of the technicians' workload.

Objectives. Assign every request within four working hours. Remove double entry between the spreadsheet and the ERP.

Users. 3 planners (office), 35 technicians (mobile, network sometimes unavailable), 2 managers (read-only), customers (tracking by link, no account).

Out of scope. Invoicing (stays in the ERP), spare-parts stock management, native mobile app.

User stories, extract.

  • Must: as a planner, I want to see unassigned requests sorted by urgency so that I handle the most critical first.
  • Must: as a technician, I want to see today's jobs on my phone, including offline, so that I can work in basements.
  • Should: as a customer, I want to follow the status of my request through a link received by email so that I do not have to call.
  • Could: as a manager, I want a monthly dashboard of response times.

Business rules, extract. BR-03: a request marked urgent and unassigned after two working hours triggers an alert to the manager. BR-07: a job cannot be closed without a report and the customer's signature.

Data. About 9,000 requests a year, 1,200 customers to import from the ERP, two years of history to import from the spreadsheet.

Interfaces. ERP: nightly read of customers, push of closed jobs. A documented API is available.

Non-functional. 40 concurrent users, authentication through the company directory, data hosted in the European Union, mobile use on the two latest versions of iOS and Android.

Acceptance. Twelve scenarios provided in an appendix, validated by two planners and three technicians on a test environment.

Outline to copy

1. Context and objectives
   1.1 The organisation
   1.2 Current situation and problems observed
   1.3 Measurable objectives
2. Users and roles
3. Scope
   3.1 In scope
   3.2 Out of scope
4. Functional needs (prioritised user stories)
5. Business rules
6. Data and volumes (including migration)
7. Interfaces with existing systems
8. Non-functional requirements
   8.1 Performance and availability
   8.2 Security
   8.3 Personal data (GDPR)
   8.4 Accessibility
   8.5 Hosting and operations
   8.6 Compatibility
9. Constraints (technical, schedule, regulatory)
10. Expected deliverables
11. Acceptance criteria
12. Schedule and milestones
13. Budget framing
14. Response format and selection criteria
Appendices: glossary, existing documents, mock-ups, acceptance scenarios

The lightweight version for an agile project

An agile project does not skip scoping: it moves the detail. You do not specify everything before starting; you set the direction and the limits, then refine iteration by iteration. If you are hesitating between the two approaches, see our comparison of agile and the V-model.

The starting document then fits in a few pages.

  • A product vision. For whom, which problem, which benefit, which success indicators.
  • An initial backlog. The main features (epics) and the user stories already known, prioritised, without aiming for completeness.
  • A defined MVP. The smallest version that delivers a real service to real users, and what is explicitly deferred.
  • The invariants. Everything that is not negotiable along the way: non-functional requirements, constraints, mandatory interfaces, budget and deadline.
  • The rules of the game. Who arbitrates priorities, how often demos take place, how a story is declared done.

Ten common mistakes

  1. Describing the solution instead of the need. "A green button at the top right" denies the supplier any better proposal.
  2. Forgetting the out-of-scope list. What is not excluded will be assumed included by one party and excluded by the other.
  3. Marking everything as high priority. No scope variant is then possible.
  4. Leaving out business rules. Special cases often account for most of the effort.
  5. Underestimating data migration. Volume, quality and duplicates must be described.
  6. Covering interfaces in one line. "Connection to the ERP" cannot be estimated.
  7. Omitting non-functional requirements. Security, performance and accessibility added afterwards cost more.
  8. Giving no budget. The quotes become impossible to compare.
  9. Not defining acceptance. Without acceptance criteria, the end of the project is negotiated.
  10. Writing alone. A document written without future users describes the theoretical process, not the real work.

What a supplier needs in order to quote

If you are short of time, concentrate on this list. It covers most of what makes a quote vary.

  • User roles and their permissions
  • The prioritised list of features
  • The most complex business rules
  • The systems to connect and the state of their APIs
  • The data to migrate: volume, source, quality
  • Security, performance and accessibility requirements
  • Technical and hosting constraints
  • The deadline and the reason for it
  • The budget envelope
  • Your availability: who decides, how many hours a week

Frequently asked questions

Who should write the software requirements specification?

The client, through the person who carries the business need, with the help of future users and internal IT. A supplier can assist during a scoping phase, but decisions on scope and priority remain yours.

What is the difference between a cahier des charges and a specification?

The cahier des charges expresses the client's need and constraints. Functional and technical specifications describe the solution chosen to meet it: screens, data model, architecture. They are produced after the supplier is selected, usually with it. In English-speaking practice, the closest equivalents are a requirements document or the statement of requirements in a request for proposal.

How long should a requirements document for a web application be?

There is no standard length. For a mid-sized business application, ten to twenty pages excluding appendices are generally enough. A longer document is rarely read in full; put the detail in appendices.

Do you need a requirements specification for an agile project?

Yes, in a lighter form: vision, prioritised backlog, MVP scope and non-negotiable requirements. Feature detail is refined sprint by sprint, but the frame must be written before starting.

Conclusion

A good requirements specification is not measured by its volume. It says clearly why the project exists, for whom, what is included and excluded, what comes first and how delivery will be accepted. With that, a supplier can commit, and you can compare proposals on the same basis.

To have your specification reviewed or to scope your need with us, write to contact@your-digital-hub.com or see our services, from scoping to operations. You can also describe your software project on our contact page.